Welcome to the Dún Laoghaire-Rathdown County Council webpage for the preparation of the Rathmichael Framework Plan.

The Planning Authority is actively progressing the preparation of a Draft Framework Plan for the Rathmichael area.
It is intended the Framework Plan will be given a statutory footing by way of a Variation of the dlr County Development Plan 2022-2028, in accordance with Section 58 of the Planning and Development Act 2024.
The pre-draft public consultation stage was undertaken in 2025. A total of 190 submissions were received. The Chief Executive's Report on Pre-Draft Consultation was prepared and is available below.
Contact Info.

Senior Executive Officer

Planning & Economic Development

Dún Laoghaire-Rathdown County Council

County Hall

Marine Road

Dún Laoghaire

Co. Dublin

 

email: dlrforwardplanning@dlrcoco.ie

Rathmichael Framework Plan

Rathmichael is identified as a 'New Residential Community' in the Core Strategy of the dlr County Development Plan 2022-2028. As noted in the County Development Plan, the future development of Rathmichael is contingent upon the timely delivery of supporting infrastructure. A plan-led approach to the development of Rathmichael is of paramount importance to ensure the proper planning and sustainable development of the area. 

 

In accordance with the provisions of the dlr County Development Plan, the Planning Department is actively progressing the preparation of a Draft Framework Plan for the Rathmichael area. The intention is to progress the Framework Plan as a Variation to the dlr County Development Plan under Section 58 of the Planning and Development Act 2024.

Pre-Draft Consultation

The pre-draft public consultation stage was undertaken in 2025. During the consultation period, two public information drop-in events were held and both events were very well attended. To help inform the pre-draft consultation, the Planning Department prepared:

  • An Issues Paper with accompanying maps and figures that pulled together baseline information by way of a study of various themes relevant to the area; and,
  • An online Story Map which provided context for the area and the plan-making process.

A total of 190 no. written submissions/observations were received from the public. The Planning Authority would like to thank everyone who took the time to prepare and submit a submission / observation and who attended the consultation events. The issues and observations raised through the pre-draft consultation process will be considered in the preparation of the Draft Plan. 

Preparation of the Draft Framework Plan

The Draft Framework Plan will be informed by a myriad of plans and policies at national, regional and local level, in addition to issues and observations raised through the pre-draft consultation process.

The Planning Authority have also undertaken / are progressing a series of studies and assessments to inform the Plan, which includes:

  • Infrastructure Capacity Assessment Study 
  • Area Based Transport Assessment 
  • Floorspace Capacity Assessment for Retail and Service Uses
  • Strategic Flood Risk Assessment 
  • Strategic Environmental Assessment 
  • Appropriate Assessment
Area Based Transport Assessment

The Planning Authority are progressing an Area Based Transport Assessment for the south east area of Dún Laoghaire-Rathdown. The objective of the ABTA is to prepare a Local Transport Plan setting out the interventions and transport and mobility objectives for the area. The ABTA process forms a key component in informing the Plan and will be completed concurrently with the finalisation of the Rathmichael Framework Plan. 

Environmental Assessment

Strategic Environmental Assessment (SEA)

In complying with SEA Directive (2001/42/EC) and Regulation 4(4) of the European Union (Land Use Planning – Strategic Environmental Assessment) Regulations 2025 (S.I. No. 456 of 2025), DLRCC has carried out a Strategic Environmental Assessment Screening and determined that a SEA is required. A copy of the SEA Screening Determination is available here.

 

Appropriate Assessment (AA)

An Appropriate Assessment (AA) Screening Determination as to whether the proposed Variation to the DLR County Development Plan 2022-2028 is likely to have significant effects on the integrity of European Sites, alone or in combination with other plans and projects, has been made under Part 6 Chapter 2 of the Planning and Development Act 2024 (as amended). 

DLRCC, having regard to the ‘Precautionary Principle’ enshrined in EU and Irish environmental law, has determined that AA is required for the proposed Variation. A Natura Impact Report will be required to be prepared. A copy of the AA Screening Determination is available here.

Documents
Pre-Draft Consultation Stage
Rathmichael - Chief Executive's Report on Pre-Draft Consultation.pdf
5.30 MB
PDF Document
Download
Rathmichael LAP Pre-Draft Consultation - Issues Paper.pdf
69.90 MB
PDF Document
Download
Rathmichael LAP Pre-Draft Consultation - Accompanying Maps.pdf
33.42 MB
PDF Document
Download
Environmental Assessment
SEA Screening Determination
310.22 KB
Other file
Download
AA Screening Determination
324.34 KB
Other file
Download
FAQ
Who can I contact if my query isn't addressed here?

In the event that your query isn't addressed on this webpage, you can email us at: dlrforwardplanning@dlrcoco.ie

We care about your feedback. Have your say.

Is this page useful?

Any concerns with your local area?

Report a problem with the Council