      Can I build an extension to my home without having to seek planning permission?

      Broadly speaking, the construction of an extension or conservatory does not require planning permission when it is to the rear of the house; however, any query from the public of this nature should be dealt with subject to the provisions of Part 1 of the 2nd Schedule to the Planning and Development Regulations, 2001.

      The following should be seen only as general guidelines;

      • Terraced and Semi-Detached Houses:  If the house has not been previously extended, the floor area of the proposed extension cannot exceed 40 sq metres.  This exemption also allows for extensions above ground-floor level (if the house is semi-detached or terraced, the area of the above ground extension cannot exceed 12 sq. m).  This means, for a typical semi-detached house, one could have a ground floor extension of 28sq. m & 2nd floor extension of 12sq m without applying for planning permission.  Any above ground floor extension shall be a distance of not less than 2 metres from any party boundary.
      • Detached Houses:  As with terraced and Semi-detached above, the overall area of extension must be less than 40 sq. metres. This exemption also allows for extensions above ground floor level, the are above ground floor are cannot exceed 20 sq. m. One could therefore have a ground floor extension of 20 sq. m., and a 2nd floor of 20 sq. m.  Any above ground floor extension shall be a distance of not less than 2 metres from any party boundary..
      • Both Cases:  If the proposed extension is in addition to an existing extension (post 01-10-1964), overall areas of all extensions must not be more than 40 sq. m. - including extensions which needed permission, e.g. to side of house.
      Can I cover my entire back garden with an extension of 40sqm?

      No.
      The extension shall not reduce the "Private Open Space" of the back garden to less than 25 sq. m. Hard surface areas to the rear of a house are exempted development, providing they are used for a purpose incidental to the enjoyment of the house and not used for the parking of cars.
       

      N.B. Existing or proposed garden shed/s are not reckoned as private open space.

      Can I build a window to the side of my extension?

      Yes, providing the following guidelines are applied;

      • Terraced and Semi-Detached Houses: Windows at ground floor level shall not be less than 1 metre from the boundary they face. Windows at above ground floor level shall not be less than 11m from the boundary they face.  The above applies to terraced s/d dwellings.
      • Detached Houses: Where the dwelling is detached and the floor area of above ground floor extension is greater than 12sqm windows shall not be less than 11m from the boundary they face.
      If I build an attic conversion do I need permission?

      Normally no.  However, if work involves dormer windows, permission is needed.  If velux windows proposed to the rear, it is exempt.  If velux windows proposed to the side/front elevation it is not exempt.

      Is the area of an attic conversion reckonable in assessing the 40sqm exemption limit for domestic extensions?

      No.

      Can I convert my garage to living accommodation without permission?

      Yes.  Subject to the provisions of Part 1 of the 2nd Schedule to the Planning & Development Regulations 2001 N.B. Garage must be attached to the dwelling.

      (Page 156 - 157).

      Can I build a balcony/roof garden on my extension without permission?

      No - specifically excluded from exemption by Part 1, Schedule 2, Column 2, Condition 7. (see page 156).

      Can I build a garden shed on my property without permission?

      Yes provided that:

      • It is not forward of the front wall of the house;
      • Not greater than 25sqm (or no. of sheds aggregated);
      • 25sqm of garden space is left. N.B. extensions attached to house are not reckoned as private open space;
      • Shed finish is in keeping with the house;
      • Shed height: max 4m pitched roof; 3m flat roof;
      • It is not lived in or used for keeping of animals (pigs, ponies, horses, pigeons).

        (see page 156 - 157, Class 3)

      Can I build a porch without permission?

      Yes, provided that:

      • Not less than 2 metres from roadway;
      • Not more than 2sqm Height: 3m max for a Flat Roof, 4m max Pitched Roof.

        (see page 158, Class 7)

      Can I build an extension to the side of my house?

      No. Not  an exempted development. However an existing garage to the side may be converted (see Section 6).

      Can I build an extension to the front of my house without permission?

      No.  This is not exempted development (except the porch - for exemptions see page 158, Class 7 and Section 9).

      Can I install a chimney, boiler house or oil tank for central heating without permission?

      Yes.  The capacity of oil tanks shall not exceed 3,500 litres (Page 156,Class 2).
      Note: from 28.02.07 exemption widened to flue, fuel storage tank or structure. 3.5k capacity still applies.

      Can I erect a T.V. antenna on my roof without permission?

      Yes.  The height of the antenna shall be no more than 6m above the roof.

      Note: These notes are for guidance only. The relevant Planning Regulations should always be consulted where doubt exists. 

      Can I erect a Satellite Dish without permission?

      Yes provided that: 

      • Only 1 per house.
      • Max. Diameter 1 metre.
      • Not to be erected on, or forward to the front wall of the house.
      • Not to be erected on the front roof slope or higher than the highest part of the roof.

        (see page 157, Class 4, 1 - 4).

      Can I build walls around my house without planning permission?

      Yes, subject to: 

      • Not more than 2m high to the rear.
      • Not more than 1.2 metres to the front or forward of the front of the house.

        (Page 157, Class 5).

        NB: Metal palisade or other security fencing is not exempt.

       

      Can I erect a gate within my property without permission?

      Yes, subject to a maximum height of 2m.

      (Page 157 Class 5, page159 Class 9)

      Can I provide car parking in my garden without permission?

      Yes. To the front or side for not more than 2 cars.

      (Page 157, Class 6, Part B(ii))

      NB. The widening of vehicular entrances is not exempt. (3.5 meters max with permission)

      Can I convert 2 or more dwelling to use as a single dwelling without permission?

      Yes.  But only if the structure was previously used as a single dwelling. e.g. a house which was used as a single dwelling when built, later converted to flats can convert back to single dwelling use under this exemption.

      Does a For Sale sign on a dwelling need permission?

      No, subject to:max area of 0.6sqm in case of a house/letting max area 1.2sqm in case of any other structure/land.
      Not more than 1 sign.  Remove not later than 7 days after sale/letting.

      Can I build a pond, path, decking or landscaping works without permission?

      Yes.  Provided that the ground level not be altered by more than 1 metre above or below the level of adjoining ground.  Alteration of ground level to front of house is not permitted other than for landscaping.

      (Page 158, Class 6)

      Can I build a tennis court without permission?

      Strictly speaking, yes, to the rear.  However, the provision of lighting and fencing over 2m would not be exempted.  The 1 metre raising/lowering of ground levels also applies.

      (Page 158, Class 6 & Page 159, Class 11)

      Can I paint my house without permission?

      Yes, except for a mural and providing the house is not a Protected Structure.

      (Page 159, Class 12)

      Can I keep a caravan/campervan or boat in my garden without permission?

      Yes, subject to:

      • Not more than 1 caravan / campervan or boat;

      • No commercial / advertising use;

      • Not used as a dwelling while stored;

      • Storage not greater than 9 months in any year.

        (Page 158, Class 8)

      Can I erect a Wind Turbine, Solar Panel, Heat Pump within the curtilage of my house?

      Yes. From 28/02/2007 these are exempted under new Class 2 to exempted regulations, subject to limitations. 

      The Planning and Development (Amendment) Regulations 2007 give effect to exempted development provisions in respect of renewable energies for dwellings and refer to the installation or erection of a solar panel on or within the curtilage of a house, or on any buildings within the curtilage of a house is exempt subject to compliance with the following conditions and limitations:

      Solar Panels:

      The total aperture area of any such panel taken together with any such panels previously placed on or within the curtilage of a house shall not exceed 12 sqm or 50% of the total roof area, whichever is the lesser;

      1.   The distance between the plane of the wall or a pitched roof and the panel shall not exceed 15 cm;

      2.   The distance between the plan of a flat roof and the panel shall not exceed 50cm;

      3.   The solar panels shall be a minimum of 50cm from any edge of the wall or roof on which it is to be mounted;

      4.   The height of a free standing solar array shall not exceed 2 metres at its highest point, above ground level;

      5.   A free standing solar array shall not be placed on or forward of the front wall of the a house;

      6.   The erection of any free standing solar array shall not reduce the area of private open space to the rear or side of the house to less than 25 sq m.

      Wind Turbines:

      The construction, erection or placing within the curtilage of a house of a wind turbine is exempt subject to the following Regulations (Class 2)

      1.   The turbine shall not be erected on or within the curtilage of a house of a wind attached to the house or any building or other structure within its curtilage.

      2.   The total height of the turbine shall not exceed 13 metres.

      3.   The rotor diameter shall not exceed 6 metres.

      4.   The minimum clearance between the lower tip of the rotor and ground level shall not be less than 3 metres.

      5.   The supporting tower shall be a distance of not less than the total structure height (including the blade of the turbine at the highest point of its arc) plus one metre from any party boundary.

      6.    Noise levels must not exceed 43db(A) during normal operation, or in excess of 5db(A) above the background noise, whichever is greater, as measured from the nearest neighbouring inhabited dwelling.

      7.   No more than one turbine shall be erected within the curtilage of a house.

      8.   No such structure shall be constructed, erected or placed forward of the front wall of a house.

      9.   All turbine components shall have a matt, non-reflective finish and the blade shall be made of material that does not deflect telecommunication signals.

      10. No sign, advertisement or object, not required for the functioning or safety of the turbine shall be attached to or exhibited on the wind turbine.

      FYI - The Planning and Development (Amendment) Regulations 2008 (SI 256 of 2008) give effect to exempted development provisions in respect of renewable energies for industrial buildings, business premises and agricultural holdings.     

      Please refer to Regulations for further information. 

       

      If my property is a Protected Structure, do these exemptions apply?

      No.  Most works to a Protected Structure are not exempted.  A declaration of what is / is not exempted is needed to clarify issues.

      Do bus shelters need permission?

      Yes, not exempted development.

      Can I erect a roadside shrine without permission?

      Yes, subject to maximum area of 2sqm, max height is 2m above the centre of the road opposite, and it is not lit.

      Is permission needed for a crèche childcare facility?

      Yes, unless the number of children, including carers is not more than 6 and caring is in carers own house.

      Change of use

      (Page 160, Class 14).

      Occasional Use

      Occasional use for recreational, social purposes of any school, hall, club, art gallery, museum, library, reading room, gym or structures normally used for public worship.

      (Page 160 Class 15).

      Is permission needed for a telephone kiosk?

      No, provided not situated with 10m of the curtilage of any dwelling house save with the consent in writing of the owner/occupier.

      (Page 167, Class 31 (c)).

      Do Statutory Undertakers need permission for routine works in the provision/maintenance/overall of their facilities (e.g. Local Authorities, ESB, Telecoms, Iarnrod Eireann, Bord Gais, etc.)?

      Generally, No. Refer to exempted development regulations for limitations.

      (Page 163).

      Does the Council need permission to do its own work?

      No, not in the normal way, but, is subject to the consultation procedures contained in Part VIII of the 2001 Planning Regulations as amended.

      How long does an applicant have to lodge additional information?

      6 months.  From 31/03/2003 an additional 3 months can be granted where agreed.

      Can I demolish a habitable home without permission?

      No, you can demolish part of a habitable home to provide a domestic extension.

      What is a Declaration and Referral on Development & Exempted Development (i.e. what is a Declaration of Exemption)?

      If a query arises as to whether a proposal requires Planning Permission or whether it is exempted development, a submission may be made, in writing with proposals or maps - the more information the better accompanied by a fee (€80.00).  The planner will consider submissions & we reply within 4 weeks as to whether it does require planning permission or not.  The applicant can refer the decision to An Bord Pleanala accompanied by a fee (€150.00).

      (Section 5, Planning & Development Act, pg 28)

      Can photocopies of maps be given out to the public?

      Photocopies of maps on planning applications registered before 11-Mar-2002 cannot be issued. Any photocopies of maps on files registered after 11-Mar-2002 must be individually date stamped and a declaration under Section 74 (4) of the Copyright and related Rights Act, 2000 must be signed by the purchaser of the maps and placed on the planning file.

      Under the Planning regulations how long do the public have to lodge a submission/observation to additional information?

      Use our Planning Deadline Calendar to calculate the last date for making an objection. 

      In accordance with Article 35 of the Planning and Development Regulations, persons who made a submission or observation on a planning application will only be notified of the receipt of Additional Information or Clarification of Additional Information, where that AI or CAI is considered significant and requires new public notices.  Objectors have 2 weeks ( 5 weeks in case of applications accompanied by an EIS) from the date of receipt by the Planning Authority of the revised notices, to make further submissions/observations.  No further fee is required.  Other persons wishing to make a submission/observation will be required to pay the prescribed fee.

      Please note that anyone other than the applicant can make an objection/observation on a planning application. 

       

      I have planning permission, how is this affected?

      Planning permission has no impact on the need for a Disability Access Certificate. If the works began on a building (other than dwellings houses) on or after January 1st 2010, then the Disability Access Certificate is required. 

      What does a 'new or greater contravention' of the Building Regulations mean?

      Material alterations or Extensions should not give rise to any ‘new or greater contravention’ in the existing building. That is, a material alteration or an extension (vertical or lateral) to an existing building should not make the existing building any worse in relation to Building Regulations.

      The following examples are given by way of clarification:

      The erection of an extension to an existing building whereby the extension is to be served for access and escape purposes by an existing staircase within the existing building:

      •        If the existing staircase was adequate for the occupancy capacity of the existing building but inadequate for the extended building, this would constitute a ‘new contravention’ of Building Regulations.

      •        If the existing staircase was inadequate for the existing building and rendered more inadequate due to the additional occupancy of the extended building, this would constitute a ‘greater contravention’ of Building Regulations.

      Note, therefore, that Building Regulations as they apply to works in connection with existing buildings being materially altered or extended, require solely that the 'status quo' be maintained in the existing building. Where an existing building contravenes Building Regulations, the material alteration or extension of such a building does not carry with it the requirement to make good such contravention, but merely that the contravention is not worsened, i.e. that no new or greater contravention arises. Building Regulations do not apply retrospectively to existing buildings where such buildings are being extended except to the extent that any new or greater contravention is not permitted.

      Where the design of a building or work on a building is changed (eg: unforeseen site conditions demand layout changes), what is expected?

      A revised Disability Access Certificate is required where significant revision is made to the design or works or a material alteration to or a material change of use of a building in respect of which a Disability Access Certificate has been granted by a Building Control Authority. You may apply to the Building Control Authority for the revised certificate.

      What options has the building owner where the application is refused or granted subject to conditions?

      There is provision for an appeal to An Bord Pleanála in such cases. The appeal must be lodged within 1 month of the date of the decision on the application –see Part VI of the Building Control Regulations.

      Note 2 requires a “certified” set of drawings. Who can ‘certify’ drawings?

      It is expected that drawings will be certified by a person qualified to do so as a building professional- this would be expected to be the professional who completed the drawings.

      Will the building owner or a person so authorised sign the statutory declaration in respect of works for which a Regularisation cert is sought?

      This is a matter between the building owner and the builder/professional engaged by the building owner.

      What height can I build my extension without permission?
      • The highest point to which the wall of an exempt extension can be built is eaves level.
      • If the proposed extension has a flat roof, it must not exceed the eves or parapet level
      • If the proposed extension has a pitched roof, it must not exceed the ridge of the existing pitched roof. 

       

      If I wish to make a submission or observation on a Planning Application, when can I do so?

      Use our Planning Deadline Calendar to calculate the last date for making an objection. 

      Submissions/observations must be made within 5 weeks beginning on the date of receipt of the planning application. The five week period commences on the day that a planning application is received, such that the last day for receipt for an objection to an application received on Tuesday 1 November is Monday 5 December. If the last day of this five week period falls on a Saturday, Sunday or Public Holiday, submissions/observations can be accepted on the next working day.

      Please note that anyone other than the applicant can make an objection/observation on a planning application. 

      For more information on the objections process please visit our Planning Objections Page

      How many vacant sites are registered with dlrcoco?

      There are currently 12 sites registered as vacant with dlrcoco. Please see the the full list here.

      What is a Protected Structure?

      Protected Structures are buildings, features and structures within Dún Laoghaire-Rathdown that are protected because they meet one or more of the Categories of Special Interest set out in Section 51 (1) of the Planning & Development Act, 2000 and Section 2.5.4 of the Architectural Heritage Protection Guidelines. These categories are Architectural, Historical, Archaeological, Artistic, Cultural, Scientific, Technical and Social.

      The list containing all the structures that are protected within Dun Laoghaire Rathdown is known as the Record of Protected Structures (RPS). Prior to an Act in 1999 these buildings or features were known as Listed Buildings, but this title no longer applies. The RPS is a dynamic record to which structures continue to be added and sometimes deleted.

      Why are you adding a new structure to the RPS?

      Section 54 of the Planning and Development Act, 2000 (as amended), states that a planning authority may add to or delete from its record of protected sturtures if it considers that an addition is necessary to protect a structure (or part of a structure) of special architectural, historical, archaeological, artistic, cultural, scientific, social or technical interest.

      The Red Brick (former) Chapel is considered to be of:

      • Architectural Interest
      • Historical Interest, and
      • Artisitc Interest.
      What are the fees at stage 1?

      There are no fees at stage 1.

      What are the fees at stage 2?

      The fee at stage to is €1,500,, that would be submitted through the planning portal.

      What are the fees at stage 1?

      There are no fees at stage 1.

      What are the fees at stage 2?

      The fee at stage two is €1,500, that would be submitted through the planning portal.

      What are the fees at stage 3?

      The fees for stage 3 are as follows:
      There is a charge of €130 per housing unit.
      Other structures are charged at €7.20 per square metre to a max of €32,400

      There is a retention charge of €390 per housing unit.
      Other structures are have a retention charge of €15 per square metre to a max of €65,000

      Submission of EIS at €10,000
      Submission of NIS at €10,000

      How can I find out further information about the mapping and submissions process?

      If further information is required on the draft map process or on making a submission please check ‘Your Questions Answered’ which can be found here. If your query relates to a particular area of land or if the answer is not contained in the FAQ’s contact the Dun Laoghaire-Rathdown County Council Planning Department.

      Further information on the process is also available in the ‘Residential Zoned Land Tax - Guidelines for Planning Authorities’. 

      As outlined above, the RZLT process has two parts.  Local authorities are required to undertake the mapping which identifies the land which is subject to the tax, including an annual update of the final map which will be published on 1 December 2023. Thereafter, the administration of the tax will be undertaken by the Revenue Commissioners.

      As Dun Laoghaire Rathdown County Council do not administer the tax we are unable to answer any queries regarding the administration of the tax. All queries regarding the administration of the tax should be directed to the Revenue Commissioners

      Having regard to the respective roles of local authorities and the Revenue Commissioners in the RZLT process, queries on the mapping should be made to Dún Laoghaire-Rathdown. This includes queries on;

      • Criteria for inclusion on Draft map
      • Submissions on Draft Map
      • Determinations on Draft Map
      • Supplemental map
      • Submissions on supplemental map
      • Determinations on Supplemental map
      • Zoning submissions
      • Appeals (which must be submitted to An Bord Pleanála)
      • Final map
      • Annual revised Final map

      Queries on administration of the tax should be made to the Revenue Commissioners website –This includes queries on;

      • What constitutes a relevant site for the purpose of RZLT
      • Liable persons
      • Amount of residential zoned land tax
      • Obligation to register
      • Obligation on liable person to prepare and deliver return
      • Abatements
      • Deferral of residential zoned land tax

      What do I do if I am a Homeowner?

      My house and garden is contained on the map. What is the consequence?
      Your house and garden is identified on the map because it meets the criteria for the tax, which is based on residential led zonings and servicing by infrastructure suitable for provision of housing.  The house and garden are not liable for the tax, as long as the house is subject to Local Property Tax (LPT).

      Do I need to make a submission?
      While anyone may make a submission, it may not be necessary, as a home owner, to make a submission.  Even if your house is identified on the maps, residences shall not be chargeable to the Residential Zoned Land Tax.

      What if my garden is greater than 0.4047ha (1 acre)?
      If your garden is greater than this size, then you need to register for the RZLT with the Revenue Commissioners, however your house and garden will not be liable for the tax. You will be able to register for RZLT from late 2023 onwards. No action needs to be taken to register at this time.  Please see revenue.ie for details closer to the time.

      What is a Local Area Plan?

      A Local Area Plan (LAP) is a statutory document prepared by the Local Authority in accordance with the requirements of the Planning and Development Act 2000 (as amended). A LAP consists of a suite of policies and objectives to guide the development of an area for a period of 6 years.

      A LAP sets out a land use strategy for the proper planning and sustainable development an area and consists of a written statement and maps indicating:

      • objectives for the zoning of land for the use solely or primarily of particular areas for particular purposes, or
      • other objectives in such detail as may be determined by the Planning Authority for the proper planning and sustainable development of the area to which it applies, including the objective of development of land on a phased basis and, detail on community facilities and amenities and on standards for the design of developments and structures.
      How do I make a submission?

      Submissions / observations on the Pre-Draft Consultation can be made in one of the following ways:

      • In writing to - Senior Executive Officer, Planning and Economic Development Department, Dún Laoghaire Rathdown County Council, County Hall, Marine Road, Dún Laoghaire, Co. Dublin, A96 K6C, or,
      • Online through our Consultation Hub
      Will there be information sessions?

      Yes, there will be two public information sessions in St. Gerard's School, Thornhill Road on:

      • Thursday 18th May from 4pm-8pm, and,
      • Monday 29th May from 4pm-8pm.

      Building Control

      What is a Disability Access Certificate?

      A Disability Access Certificate is a certificate granted by a Building Control Authority which certifies compliance of the design of certain works (e.g. new buildings (except dwelling houses), some extensions to, and some material alterations to buildings (except dwelling houses) with the requirements of Part M of the Building Regulations. 

      When is a Disability Access Certificate required?

      A  Disability Access Certificate is required in respect of the following works to buildings other than dwellings (but including apartment buildings), in so far as the Requirements of Part M apply and which commence or take place on or after 1 January 2010;

      (a) works in connection with the design and construction of a new building,

      (b) works in connection with the material alteration of—

      (i) a day centre,

      (ii) a building containing a flat,

      (iii) a hotel, hostel or guest building, or

      (iv) an institutional building, or

      (v) a place of assembly, or

      (vi) a shopping centre,

      but excluding works to such buildings, consisting solely of minor works,

      (c) works in connection with the material alteration of a shop, office or industrial building where —

      (i) additional floor area is being provided within the existing building, or

      (ii) the building is being subdivided into a number of units for separate occupancy,

      (d) works in connection with the extension of a building by more than 25 square metres,

      (e) a building as regards which a material change of use takes place, (see note below)

      It should be noted in this context, that the Requirements of Part M 2000

      • apply to all works in connection with a material alteration or an extension, without requiring any further work to the existing building1,2.

      • do not apply to a material change of use, except where a material alteration or extension is associated with the material change of use, in which case refer to the previous point3.

      1 Article 11 of the Building Regulations 1997-2008 also stipulates the Regulations apply to every part of a buildings affected by the material alteration or extension but only to the extent of prohibiting any works which would cause a new or greater contravention, in such building.

      2 Part M does not apply to works in connection with extensions to and the material alterations of existing dwellings, provided that such works do not create a new dwelling.

      3 The Requirements of Part M 2010 due to commence on 1 January 2012 amended Article 13 to include the application of Part M to certain material changes of use. It also amended Article 11 of the Building Regulations to extend the definition of a Material Alteration to include Part M. 

      Are there transitional arrangements for the introduction of the Disability Access Certificate?

      The requirement for a Disability Access Certificate came into effect on 1st January 2010 for new buildings (other than dwellings houses) which commence on or after that date. 

      Is a Disability Access Certificate required prior to submitting a commencement notice?

      A person shall not carry out works in contravention of Part M of the Second Schedule to the Building Regulations 2000 or any conditions subject to which a Disability Access Certificate is granted (where a Disability Access Certificate is required). 

      To avoid potentially expensive remedial work,  it would be considered good practice to apply for a DAC at the same time as a Fire Safety Certificate ((FSC) prior to submitting a commencement notice), therefore ensuring that the DAC and any conditions pertaining to it are set out prior to commencement of works.  

      However, a DAC may be applied for after commencement notice, but in no case shall a building be opened, operated or occupied or permitted to do so unless a DAC has been granted or pending determination of an appeals process.

      A commencement notice must be submitted between 14-28 days in advance of work commencing.

      Can works commence on a relevant development prior to the granting of a Disability Access Certificate?

      Technically, a Disability Access Certificate is not required in advance of commencement of work. However, a person shall not carry out works in contravention of Part M of the Second Schedule to the Building Regulations 2000 or any conditions subject to which a Disability Access Certificate is granted (where a Disability Access Certificate is required). 

      To avoid potentially expensive remedial work,  it would be considered good practice to apply for a Disability Access Certificate at the same time as a Fire Safety Certificate, therefore ensuring that the Disability Access Certificate and any conditions pertaining to it are set out prior to commencement of works.  

      How long will a Disability Access Certificate take to process?

      The timescale is up to 8 weeks under Section 6(5) of the Building Control Act, 1990, or longer if agreed between the applicant and the Building Control Authority.

      When should I apply for the Disability Access Certificate?

      You should apply at the same time as applying for a Fire Safety Certificagte. The time scale for assessment of both applications is the same. This ensures you have all relevant information prior to construction

      What If I have my Fire Safety Certificate already but no Disability Access Certificate?

      Apply for the Disability Access Certificate immediately/ as soon as possible. Paragraph 2(b) of Departmental Circular BC11/2009 lists what should be provided with the application. Further material may be requested by the Building Control Authority.

      If a proposed development has already been granted planning permission and a FSC prior to 01/01/10, but works have not commenced prior to that date, is a Disability Access Certificate required?

      Yes. 

      Is a Disability Access Certificate required for a material change of use of a building ?.

      A Disability Access Certificate is required for certain works to which the Requirements of Part M apply. Refer to Article 20 D (1) of S.I. 351)  Part M will apply to a material change of use of a building only when it includes a material alteration - in such cases Part M will apply to all works in connection with the material alteration and a Disability Access Certificate should be applied for.

      Does an application for a Disability Access Certificate have to show compliance with the proposal for a revised Part M, which was the subject of a public consultation process in 2009?

      No. The Disability Access Certificate will certify compliance with the requirements of the current Part – Part M 2000. Draft Part M 2009 proposals have not yet been finalised. However, additional information may be required for Disability Access Certificate applications when future revisions of part M become operative.

      Which of these scenarios require a Disability Access Certificate?

      Yes:  New buildings, including apartment blocks

      No:  Dwelling houses

      Yes:  Material alteration to a day care centre, apartment block, hotel, hostel, guest building, institutional building, place of assembly, shopping centre

      Yes:  Material alteration to a shop, office or industrial building where additional floor area is provided within existing building or building is being subdivided into a number of units for separate occupancy.

      Yes:  Extension to an existing building other than a dwelling house of greater that 25m2

      No:  Existing building was damaged/burnt and is being repaired.

      No:   A material change of use, by itself -  see above

      Yes:  A material change of use involving a material alteration associated with the change of use.

      Will there be a 7 day Notice or a Regularisation Certificate in respect of the Disability Access Certificate?

      There is no need for a 7 day notice in respect of a Disability Access Certifiate, as a Disability Access Certificate is not required prior to commencement - see above.

      There is no need for a regularisation certificate as Disability Access Certificate only applies to works commencing from Jan 1 2010 and not retrospectively. A Disability Access Certificate must be acquired prior to opening, operating or occupying a building to which works required a Disability Access Certificate. A Disability Access Certificate can be applied for this purpose. 

      What is the fee for a Disability Access Certificate?

      The fee is €800 per building.

      Why are schools, bar the smallest, not exempt from Disability Access Certificate fees?

      The Regulations provide for an exemption from fees for primary schools only with 4 mainstream teachers or less, as requested by the Department of Education and Science.

      Is there a sq.m application fee for a Disability Access Certificate?

      There is no sq.m application fee for a Disability Access Certificate.

      Can agents sign the Disability Access Certificate application form on behalf of the applicant?

      Yes, if they are authorised to do so by the building owner.

      The form for a revised Disability Access Certificate requires working drawings. Working drawings are only progressed where work has commenced.

      The need for a revised Disability Access Certificate is not limited to works which have not commenced. It applies where significant revision is made to the design of the building or  works already commenced.  

      If a Disability Access Certificate has not been sought for a building where it is required or where an appeal has been lodged with An Bord Pleanála in respect of a decision on a Disability Access Certificate application, what is the position?

      A building cannot be opened, operated or occupied or permitted to be opened, operated or occupied  without the necessary Disability Access Certificate  or where an appeal has been lodged, pending the determination of the appeal. 

       

      What is a Regularisation Certificate?

      A certificate granted by a building control authority in respect of works on non-domestic buildings and apartments blocks which were commenced or completed  without  the necessary Fire Safety Certificate (FSC). The certificate may be granted with or without conditions or refused. 

      Is there a fee for a Regularisation Certificate?

      The fee is €500 which is four times the fee for a Fire Safety Certificate or €11.60 per square metre of floor area, whichever is greater. This may vary depending on the works - please see the Fifth Schedule of the Building Control Regulations.

      A period of 4 months is set down to comply with conditions which may be inserted by the Building Control Authority in a Regularisation cert. This is not sufficient time and is there a mechanism to extend it?

      There is no mechanism to extend. It is an offence to commence work on a building without a Fire Safety Certificate (where required) and the Regularisation Cert is a chance to be in compliance  with the fire safety certification regime. If the works are not carried out within the 4- month period, the certificate will not have effect.

      Can a solicitor sign a statutory declaration as a Commissioner of Oaths?

      Yes, when s/he is also a Commissioner of Oaths. However, a solicitor shall not exercise these powers in any proceedings in which he is solicitor to any of the parties or in which he has an interest.

      Do I require a Final Grant of Planning Permission before I submit my Commencement Notice?

      Yes. Final Grant is required before a commencement notice can be submitted. 

      How many days prior to starting the development am I required to submit a Commencement Notice?

      You must submit a Commencement notice between 14 - 28 days before starting works, informing the Building Authority of your intended start date. If this is not completed youa re in breach of your Planning Conditions. 

      Can I still submit a paper copy of a Commencement Notice?

      No. Paper copies are no longer accepted. All forms must now be submitted electronically via the Building Control Management System (BCMS) website. 

      What is the Fee for a Commencement Notice?

      The fee is €30 per unit

      If my development is Apartments/Commercial do I require a Fire Safety Certificate?

      Yes. When submitting a commencement notice for a Commerical Development or Apartments a Fire Safety Certificate must also be submitted. 

      If I am building several apartments in a one block.What is the fee?

      The fee is €30 per block of apartments. You do not require a separate commencement notice for each apartment.
      e.g 100 apts in one block = €30

      What is a 7 day notice?

      It is a fast track notification of commencement of work prior to the granting of a Fire Safety Certificate.

      What is the fee for a 7 day notice?

      The standard fee is €250 or €5.80 per square metre of floor, whichever is the greater. This is double the amount for a standard Fire Safety Certificate application. 

      The fee may vary depending on the work proposed and the fees are listed in the Fifth Schedule of the Building Control Regulations
      Do I need to apply for a Fire Safety Certificate as well and do I have to pay a fee for both?

      Yes, the 7 Day notice must be accompanied by a valid Fire Safety Certificate application and a statutory declaration form in respect of the work proposed, but only the fee for the 7 day notice applies. 

      You do not have to submit separate fees for both the 7 Day Notice and the Fire Safety Certificate.
      Can you apply for a 7 day notice if you have already applied for a Fire Safety Certificate?

      Yes, if you have made a valid application for a Fire Safety Certificate you may submit a 7 day notice provided you submit the reference number of the original application, the revised fee and all the required documentation as listed in Article 20A of the Regulations. You should liaise with your local Building Control Authority.

      Planning Applications - Online Search

      Can I lodge a submission on an SHD application?

      Submissions/observations for Strategic Housing Development SHD applications must be sent to An Bord Pleanála only.  Any submissions on SHD applications which are sent to this County Council will be returned to the sender.

      County Development Plan

      What is a Development Plan?

      In simple terms, a Development Plan is a spatial plan that guides the future development of a County for a six-year period through a suite of policy objectives, land use zoning objectives and development management guidance.

      A Development Plan must ensure that there is enough land zoned in the County to meet our housing requirements which are set at a regional level. Chapter 1 of the Plan sets out more detail in relation to the legislative context and structure of the Development Plan.

      A short video was prepared at the Draft Plan stage which provides an overview of what a Development Plan is and the vision for the County for the period 2022-2028 (note: the Draft Plan consultation ended in April 2021 - submissions can no longer be accepted). 

      Section 10 of the Planning and Development Act, 2000 (as amended) sets out the statutory content of a Development Plan – these requirements are summarised in Appendix A of the pre-draft ‘Have Your Say’ document.

      Can I still view the Draft Plan, Amendments to the Draft Plan and Chief Executive's Reports?

      All plan documents and Chief Executive's Reports associared with each stage involved in the preparation of the County Development Plan 2022-2028 is set out above.

      The Draft Plan can also still be viewed within the virtual room that was prepared for its consulation phase.

       

      Can I download documents?

      Yes – all Development Plan documents are provided on our webpage as downloadable PDFs.

      Each Volume of the Chief Executive’s Report is provided on our webpage as a downloadable PDF.

      Note: The Ministerial Direction effects certain parts of the adopted Plan that is currently available to download. The Planning Authority are updating all relevant sections which will be available to download in due course. 

      Will the Development Plan tell me what is happening in my area?

      A Development Plan sets out the land use zoning objectives for an area.

      The land use zoning objectives for the County are set out over a series of 14 maps and an interactive webmap.

      Certain uses which may be permitted in principle or open for consideration within each land use zone is set out Chapter 13 of the Development Plan.

      Proposed development within an area occurs when a developer (public or private), or an individual, proposes and obtains the relevant planning permission. This ‘development management’ process is separate to the Development Plan making process. Proposed development is required to accord with the provisions of a Development Plan.

      I’m not sure which map is relevant to my area, is there another way to find out what land use objectives are relevant to me?

      Yes – our interactive map has an address search function.  To zoom into your desired location, simply enter your address or Eircode, in the ‘find’ bar located at top left of the map.

      If you want to download the map relevant to your area, the easiest way to find the correct map is to visit the map area in our virtual room where a map index shows all map numbers and the areas they cover.

      Why have I received a letter / more than one letter?

      All owners and occupiers of properties or structures added to or deleted from the Record of Protected Structures (RPS) in the adopted Plan are legally required to be notified as per Section 12(13) of the Planning and Development Act (as amended).

      The requirements of Section 12(13) of the Act may result in you receiving two letters if the owner is also occupier the structure added or deleted from the RPS.

      The Record of Protected Structures is set out in Appendix 4 of the Development Plan and are shown in a dark yellow colour on land use zoning maps

      Why was my property added to the Record of Protected Structures (RPS)?

      Your property / structure was been recommended for inclusion onto the Record of Protected Structures “in order to protect a structure, or part of a structure, of special architectural, historical, archaeological, artistic, cultural, scientific, social or technical interest” (Section 54 of the Planning and Development Act, 2000, as amended).

      A notice was issued to owners/occupiers of properties/structures recommended to be added to the RPS at Draft Plan stage. The notice issued states whether the recommendation was made by the Minister for Housing, Local Government and Heritage or by the Planning Authority.

      Properties / structures recommended for addition by the Minister resulted from surveys carried out for part of the County. More specific details for a particular structure can be found in the surveys of the National Inventory of Architectural Heritage: here.

      Properties / structures recommended for addition by the Planning Authority were as a result of either - submissions received at pre-draft stage (see pre-draft CE Report for details), Motions from Elected Members (see Special Meetings from December 15-18th 2020), the property / structure was brought to our attention during the preparation of the current County Development Plan 2016-2022 or when dealing with planning applications since the adoption of the current Plan.

      Further details with regard to Protected Structures can be found here on the Conservation section of our website.

      I have received a letter in error – who should I contact?

      If you have received a letter in relation to the addition of property / structure to the Record of Protected Structures in error, please advise the Planning Department as soon as possible using the contact details at the top of the letter.

      I don’t agree or I think an amendment is required, can I do anything about the addition of my property / structure to the RPS?

      If you do not agree with the addition of your property / structure to the RPS or if you think an amendment is required to the name / address / description of the structure or the extent of the structure on the land use maps, please make a submission on the Draft Plan. Please ensure to clearly identify the structure in question in your submission.
      All submissions / observations received in relation to properties / structures recommended by the Minister for Housing, Local Government and Heritage will be sent to the Minister for their consideration.
      Details on how to make a submission to the Draft Plan can be viewed here.

      Why was my property not added to the RPS previously?

      The surveys carried out by the Minister for Housing, Local Government and Heritage for part of the County were not fully completed prior to the adoption of the current County Development Plan 2016-2022.

      What is an Architectural Conservation Area (ACA) and where can I find more details on new ACA's?

      An Architectural Conservation Area (ACA) is a place, area, group of structures or townscape that is of special architectural, historical, archaeological, technical, social, cultural, or scientific, interest, or that contributes to the appreciation of a Protected Structure. An ACA aims to identify and protect areas of special significance and promote an awareness of this significance.

      All ACA's are listed in Appendix 4 of the Development Plan with links to each of their Character Appraisal documents.

      Further details with regard to ACA’s in general can be found here on the Conservation section of our website.

       

      Can changes be made to the boundary of a proposed ACA?

      If you consider that further adjustment to the boundary of a proposed ACA is required, please make a submission on the Draft Plan.
      Details on how to make a submission to the Draft Plan can be viewed here.

      If my query isn’t listed here, who should I contact?

      In the event that your query has not been covered here, please contact E: planning@dlrcoco.ie / T: 01 2054700.

      DISCLAIMER

      The list of FAQs do not purport to be a legal interpretation of the Planning and Development Act 2000, (as amedned) and are simply for information purposes.

      Can I get a hard copy of the Plan?

      The Dún Laoghaire Rathdown County Development Plan 2022-2028 is available to view above. Hardcopies are available to view at Planning Department, County Hall, Marine Road, Dún Laoghaire, Co. Dublin Mon-Fri (excluding Bank Holidays) between 10.00a.m. and 4.00p.m. and at the Council Offices, Dundrum Office Park Main Street, Dundrum, Dublin 14 Mon-Fri (excluding Bank Holidays) from 9.30a.m. to 12.30p.m. and 1.30p.m. to 4.30p.m.


      Hardcopies of the Plan will not be available to purchase until after the process of updating plan documents and maps, to incorpoarte the requirements of the Ministerial Direction, is complete.

      My property appears to be within a flood zone – why is this?

      Flood Zone Maps are maps of areas predicted to be at risk of flooding in the 1.0% annual exceedance probability (AEP) event (1 in 100 year - Flood Zone A) and the 0.1% AEP event (1 in 1000 year - Flood Zone B).
      The Flood Zone Maps were produced as an output of the Eastern Catchment Flood Risk Assessment & Management (ECFRAMs) project (2010 -2017) and were subject to statutory consultation and approval during that period.


      For specific flood risk considerations of an area, please Appendix 15 Strategic Flood Risk Assessment of the Development Plan.

      The interactive map isn’t working properly – what can I do?

      The interactive map may not function properly for a number of reasons, often a simple refresh of the page will reload it without issue. Some other suggestions that may remedy your issue include:
      • The interactive map works best and should be opened on one of the following web browsers: Chrome, Firefox, Safari or Edge.
      • Please ensure that you have accepted the terms and conditions by ticking the box upon opening the map.
      • Some layers will not load until you zoom into an area.
      • The mapping service provider esri may be carrying out essential updates – this is usually a very limited time only and the map may load successfully again in 10-15 minutes time.

      Land use mapping for the entire county is available to download as separate PDF documents from our webpage.
      In the event that you continue to have difficulty accessing the interactive map, please contact us planning@dlrcoco.ie with details of the issue.

      Why was the Draft Plan amended?

      During the Special Development Plan Council meetings on 12th, 13th, 14th,18th 19th, 20th and 21st of October 2021, the Elected Members, by way of resolution, agreed to amend the Draft Development Plan.
      The proposed amendments, or material alterations, resulted from:
      • A recommendation in the Chief Executive’s Report on Draft Plan Consultation,
      • A motion proposed by an Elected Member, and/or
      • A combination of the above.

      Will there be someone available to answer queries during the public consultation?

      Members of the planning team will be available to answer queries at the following times / locations (subject to public health guidelines):

      • Tuesday 16th November, 10:00 am – 1:00 pm, County Hall, Dún Laoghaire.
      • Thursday 25th November, 2:00 pm – 4:00 pm, Dundrum Civic Offices.
      • Tuesday 30th November, 9:30 am – 12:30 pm, Dundrum Civic Office.
      • Wednesday 8th December, 2:00 pm – 4:00 pm, County Hall, Dún Laoghaire.
      • Thursday 16th December, 2:00 pm - 4:00 pm, County Hall, Dún Laoghaire.
      • Tuesday 11th January 2022, 9:30 am – 12:30 pm: Dundrum Civic Office.

      For queries outside of these times, please contact E:  devplan@dlrcoco.ie / T: 01 2054700.

      When did the new Development Plan come into force?

      The County Development Plan 2022-2028 was made / adopted, with amendments, by the elected members during Special County Development Plan meetings on the 9th and 10th March 2022.

      Section (12) (17) of the Planning and Development Act, 2000 (as amended), states:

      "A development plan made under this section shall have effect 6 weeks from the day that it is made."

      The new plan came into force on the 21st April 2022.

      When will planning applications be assessed under the new Plan?

      Proposed development (planning applications) will be assessed upon the provisions of the development plan in force at the time of making a decision in accordance with Section 34(2)(a) of the Planning and Development Act 2000 (as amended), which states:

      “(2) (a) When making its decision in relation to an application under this section,
      the planning authority shall be restricted to considering the proper planning
      and sustainable development of the area, regard being had to—
      (i)   the provisions of the development plan, …”

      The Plan came into force on 21st April 2022 therefore all decisions are now being assessed having regard to the policy objectives of the new plan.

      When and where can I view the adopted Plan?

      The Dún Laoghaire Rathdown County Development Plan 2022-2028 is available to view above. Hardcopies are available to view at Planning Department, County Hall, Marine Road, Dún Laoghaire, Co. Dublin Mon-Fri (excluding Bank Holidays) between 10.00a.m. and 4.00p.m. and at the Council Offices, Dundrum Office Park Main Street, Dundrum, Dublin 14 Mon-Fri (excluding Bank Holidays) from 9.30a.m. to 12.30p.m. and 1.30p.m. to 4.30p.m.

      Hardcopies of the Plan will not be available to purchase until the process relating to the Draft Ministerial Direction is complete.

       

      What is a Ministerial Direction?

      As set out in Section 31 of the Planning and Development Act, 2000 (as amended), a Minister for Local Government and Planning may issue a ‘direction’ to amend a plan where they are of the opinion that a County Development Plan:

      • Has failed to implement the recommendations of, or take account of a submission made by, the Minister or the Office of the Planning Regulator;
      • Has failed to set out an overall strategy for the proper planning and sustainable development of the area;
      • Is not consistent with – the National Planning Framework, the Regional Spatial and Economic Strategy or a specific planning policy requirement specified set out in the Section 28 Guidelines;
      • Is not in compliance with the requirements of the Act;
      • Is not consistent with the transport strategy of the National Transport Authority (within the Greater Dublin Area).
      Why has the Minister issued a Direction?

      As per Section 31AM(6) of the Planning and Development Act, 2000 (as amended), the Planning Authority notified the Office of the Planning Regulator (OPR) of the making of the Plan within 5 working days of its adoption.

      The OPR was of the opinion that the development plan was not made in a manner consistent with the recommendations of the office and failed to set out an overall strategy for the proper planning and sustainable development of the area concerned. The OPR therefore issued a notice with recommendations to the Minister for Local Government and Planning.

      The Minister exercised his function to rectify the matter by issuing a Draft Direction in accordance with Section 31(7) of the Planning and Development Act, 2000 (as amended), to the Planning Authority with regard the making of the Dún Laoghaire-Rathdown County Development Plan 2022-2028.

      In accordance with Section 31 of the Planning and Development Act, 2000 (as amended), the Minister issued the Planning and Development (Dún LaoghaireRathdown County Development Plan 2022-2028) Direction 2022 to the Planning Authority on 28th September 2022. 

      What impact does the Ministerial Direction have on the Development Plan?

      In accordance with the Planning and Development (Dún LaoghaireRathdown County Development Plan 2022-2028) Direction 2022, the following sections of the County Development Plan 2022-2028 did not come into force on 21st April 2022 and will be deleted from the Adopted Plan:

      • The 0/0 objective including the symbol, boundary of objective area* as set out on Land Use Zoning Maps 3, 4, 7 and 10.

      • The text “No increase in the number of buildings permissible” in the legend of Land Use Zoning Maps 1-14.

      • The policy section on ‘Notable Character Area Exclusions’ under section 4.3.1.1 of Chapter 4 (pg. 84) of the Written Statement.
        Section 12.3.7.8 ‘0/0 Zone’ of Chapter 12 (pg. 246-248) of the Written Statement.

      • The second paragraph of Section 12.3.3 ‘Quantitative Standards for All Residential Development’ of Chapter 12 (pg. 236) of the Written Statement, which states: “That the requirement for certain percentages of 3-bed units in apartments shall apply to Build To Rent developments to accord with mix on page 237.”

      *An objective area boundary will be retained on Land Use Zoning Maps 3, 4, 7 and 10 for Specific Local Objective (SLO)130.

      Only those sections listed above are affected by the Direction, the remainder of the County Development Plan 2022-2028 came into force on 21st April 2022.

      The Planning Auhtority are now making the necessary changes to the Adopted Plan documents and maps which will be published online and made available to view and/or purchase thereafter.

      Planning Legislation, Regulation & Guidelines

  • Water & Drainage
  • Recycling & Waste
  • Travel & Transport
  • Housing
  • The Council & Democracy
  • Finance
  • Heritage
  • Cemeteries
  • Parks & Outdoors
  • Community
  • Architecture
  • Film Locations
  • Information Technology
  • Dún Laoghaire Baths

Planning

Can I build an extension to my home without having to seek planning permission?

Broadly speaking, the construction of an extension or conservatory does not require planning permission when it is to the rear of the house; however, any query from the public of this nature should be dealt with subject to the provisions of Part 1 of the 2nd Schedule to the Planning and Development Regulations, 2001.

The following should be seen only as general guidelines;

  • Terraced and Semi-Detached Houses:  If the house has not been previously extended, the floor area of the proposed extension cannot exceed 40 sq metres.  This exemption also allows for extensions above ground-floor level (if the house is semi-detached or terraced, the area of the above ground extension cannot exceed 12 sq. m).  This means, for a typical semi-detached house, one could have a ground floor extension of 28sq. m & 2nd floor extension of 12sq m without applying for planning permission.  Any above ground floor extension shall be a distance of not less than 2 metres from any party boundary.
  • Detached Houses:  As with terraced and Semi-detached above, the overall area of extension must be less than 40 sq. metres. This exemption also allows for extensions above ground floor level, the are above ground floor are cannot exceed 20 sq. m. One could therefore have a ground floor extension of 20 sq. m., and a 2nd floor of 20 sq. m.  Any above ground floor extension shall be a distance of not less than 2 metres from any party boundary..
  • Both Cases:  If the proposed extension is in addition to an existing extension (post 01-10-1964), overall areas of all extensions must not be more than 40 sq. m. - including extensions which needed permission, e.g. to side of house.
Can I cover my entire back garden with an extension of 40sqm?

No.
The extension shall not reduce the "Private Open Space" of the back garden to less than 25 sq. m. Hard surface areas to the rear of a house are exempted development, providing they are used for a purpose incidental to the enjoyment of the house and not used for the parking of cars.
 

N.B. Existing or proposed garden shed/s are not reckoned as private open space.

Can I build a window to the side of my extension?

Yes, providing the following guidelines are applied;

  • Terraced and Semi-Detached Houses: Windows at ground floor level shall not be less than 1 metre from the boundary they face. Windows at above ground floor level shall not be less than 11m from the boundary they face.  The above applies to terraced s/d dwellings.
  • Detached Houses: Where the dwelling is detached and the floor area of above ground floor extension is greater than 12sqm windows shall not be less than 11m from the boundary they face.
If I build an attic conversion do I need permission?

Normally no.  However, if work involves dormer windows, permission is needed.  If velux windows proposed to the rear, it is exempt.  If velux windows proposed to the side/front elevation it is not exempt.

Is the area of an attic conversion reckonable in assessing the 40sqm exemption limit for domestic extensions?

No.

Can I convert my garage to living accommodation without permission?

Yes.  Subject to the provisions of Part 1 of the 2nd Schedule to the Planning & Development Regulations 2001 N.B. Garage must be attached to the dwelling.

(Page 156 - 157).

Can I build a balcony/roof garden on my extension without permission?

No - specifically excluded from exemption by Part 1, Schedule 2, Column 2, Condition 7. (see page 156).

Can I build a garden shed on my property without permission?

Yes provided that:

  • It is not forward of the front wall of the house;
  • Not greater than 25sqm (or no. of sheds aggregated);
  • 25sqm of garden space is left. N.B. extensions attached to house are not reckoned as private open space;
  • Shed finish is in keeping with the house;
  • Shed height: max 4m pitched roof; 3m flat roof;
  • It is not lived in or used for keeping of animals (pigs, ponies, horses, pigeons).

    (see page 156 - 157, Class 3)

Can I build a porch without permission?

Yes, provided that:

  • Not less than 2 metres from roadway;
  • Not more than 2sqm Height: 3m max for a Flat Roof, 4m max Pitched Roof.

    (see page 158, Class 7)

Can I build an extension to the side of my house?

No. Not  an exempted development. However an existing garage to the side may be converted (see Section 6).

Can I build an extension to the front of my house without permission?

No.  This is not exempted development (except the porch - for exemptions see page 158, Class 7 and Section 9).

Can I install a chimney, boiler house or oil tank for central heating without permission?

Yes.  The capacity of oil tanks shall not exceed 3,500 litres (Page 156,Class 2).
Note: from 28.02.07 exemption widened to flue, fuel storage tank or structure. 3.5k capacity still applies.

Can I erect a T.V. antenna on my roof without permission?

Yes.  The height of the antenna shall be no more than 6m above the roof.

Note: These notes are for guidance only. The relevant Planning Regulations should always be consulted where doubt exists. 

Can I erect a Satellite Dish without permission?

Yes provided that: 

  • Only 1 per house.
  • Max. Diameter 1 metre.
  • Not to be erected on, or forward to the front wall of the house.
  • Not to be erected on the front roof slope or higher than the highest part of the roof.

    (see page 157, Class 4, 1 - 4).

Can I build walls around my house without planning permission?

Yes, subject to: 

  • Not more than 2m high to the rear.
  • Not more than 1.2 metres to the front or forward of the front of the house.

    (Page 157, Class 5).

    NB: Metal palisade or other security fencing is not exempt.

 

Can I erect a gate within my property without permission?

Yes, subject to a maximum height of 2m.

(Page 157 Class 5, page159 Class 9)

Can I provide car parking in my garden without permission?

Yes. To the front or side for not more than 2 cars.

(Page 157, Class 6, Part B(ii))

NB. The widening of vehicular entrances is not exempt. (3.5 meters max with permission)

Can I convert 2 or more dwelling to use as a single dwelling without permission?

Yes.  But only if the structure was previously used as a single dwelling. e.g. a house which was used as a single dwelling when built, later converted to flats can convert back to single dwelling use under this exemption.

Does a For Sale sign on a dwelling need permission?

No, subject to:max area of 0.6sqm in case of a house/letting max area 1.2sqm in case of any other structure/land.
Not more than 1 sign.  Remove not later than 7 days after sale/letting.

Can I build a pond, path, decking or landscaping works without permission?

Yes.  Provided that the ground level not be altered by more than 1 metre above or below the level of adjoining ground.  Alteration of ground level to front of house is not permitted other than for landscaping.

(Page 158, Class 6)

Can I build a tennis court without permission?

Strictly speaking, yes, to the rear.  However, the provision of lighting and fencing over 2m would not be exempted.  The 1 metre raising/lowering of ground levels also applies.

(Page 158, Class 6 & Page 159, Class 11)

Can I paint my house without permission?

Yes, except for a mural and providing the house is not a Protected Structure.

(Page 159, Class 12)

Can I keep a caravan/campervan or boat in my garden without permission?

Yes, subject to:

  • Not more than 1 caravan / campervan or boat;

  • No commercial / advertising use;

  • Not used as a dwelling while stored;

  • Storage not greater than 9 months in any year.

    (Page 158, Class 8)

Can I erect a Wind Turbine, Solar Panel, Heat Pump within the curtilage of my house?

Yes. From 28/02/2007 these are exempted under new Class 2 to exempted regulations, subject to limitations. 

The Planning and Development (Amendment) Regulations 2007 give effect to exempted development provisions in respect of renewable energies for dwellings and refer to the installation or erection of a solar panel on or within the curtilage of a house, or on any buildings within the curtilage of a house is exempt subject to compliance with the following conditions and limitations:

Solar Panels:

The total aperture area of any such panel taken together with any such panels previously placed on or within the curtilage of a house shall not exceed 12 sqm or 50% of the total roof area, whichever is the lesser;

1.   The distance between the plane of the wall or a pitched roof and the panel shall not exceed 15 cm;

2.   The distance between the plan of a flat roof and the panel shall not exceed 50cm;

3.   The solar panels shall be a minimum of 50cm from any edge of the wall or roof on which it is to be mounted;

4.   The height of a free standing solar array shall not exceed 2 metres at its highest point, above ground level;

5.   A free standing solar array shall not be placed on or forward of the front wall of the a house;

6.   The erection of any free standing solar array shall not reduce the area of private open space to the rear or side of the house to less than 25 sq m.

Wind Turbines:

The construction, erection or placing within the curtilage of a house of a wind turbine is exempt subject to the following Regulations (Class 2)

1.   The turbine shall not be erected on or within the curtilage of a house of a wind attached to the house or any building or other structure within its curtilage.

2.   The total height of the turbine shall not exceed 13 metres.

3.   The rotor diameter shall not exceed 6 metres.

4.   The minimum clearance between the lower tip of the rotor and ground level shall not be less than 3 metres.

5.   The supporting tower shall be a distance of not less than the total structure height (including the blade of the turbine at the highest point of its arc) plus one metre from any party boundary.

6.    Noise levels must not exceed 43db(A) during normal operation, or in excess of 5db(A) above the background noise, whichever is greater, as measured from the nearest neighbouring inhabited dwelling.

7.   No more than one turbine shall be erected within the curtilage of a house.

8.   No such structure shall be constructed, erected or placed forward of the front wall of a house.

9.   All turbine components shall have a matt, non-reflective finish and the blade shall be made of material that does not deflect telecommunication signals.

10. No sign, advertisement or object, not required for the functioning or safety of the turbine shall be attached to or exhibited on the wind turbine.

FYI - The Planning and Development (Amendment) Regulations 2008 (SI 256 of 2008) give effect to exempted development provisions in respect of renewable energies for industrial buildings, business premises and agricultural holdings.     

Please refer to Regulations for further information. 

 

If my property is a Protected Structure, do these exemptions apply?

No.  Most works to a Protected Structure are not exempted.  A declaration of what is / is not exempted is needed to clarify issues.

Do bus shelters need permission?

Yes, not exempted development.

Can I erect a roadside shrine without permission?

Yes, subject to maximum area of 2sqm, max height is 2m above the centre of the road opposite, and it is not lit.

Is permission needed for a crèche childcare facility?

Yes, unless the number of children, including carers is not more than 6 and caring is in carers own house.

Change of use

(Page 160, Class 14).

Occasional Use

Occasional use for recreational, social purposes of any school, hall, club, art gallery, museum, library, reading room, gym or structures normally used for public worship.

(Page 160 Class 15).

Is permission needed for a telephone kiosk?

No, provided not situated with 10m of the curtilage of any dwelling house save with the consent in writing of the owner/occupier.

(Page 167, Class 31 (c)).

Do Statutory Undertakers need permission for routine works in the provision/maintenance/overall of their facilities (e.g. Local Authorities, ESB, Telecoms, Iarnrod Eireann, Bord Gais, etc.)?

Generally, No. Refer to exempted development regulations for limitations.

(Page 163).

Does the Council need permission to do its own work?

No, not in the normal way, but, is subject to the consultation procedures contained in Part VIII of the 2001 Planning Regulations as amended.

How long does an applicant have to lodge additional information?

6 months.  From 31/03/2003 an additional 3 months can be granted where agreed.

Can I demolish a habitable home without permission?

No, you can demolish part of a habitable home to provide a domestic extension.

What is a Declaration and Referral on Development & Exempted Development (i.e. what is a Declaration of Exemption)?

If a query arises as to whether a proposal requires Planning Permission or whether it is exempted development, a submission may be made, in writing with proposals or maps - the more information the better accompanied by a fee (€80.00).  The planner will consider submissions & we reply within 4 weeks as to whether it does require planning permission or not.  The applicant can refer the decision to An Bord Pleanala accompanied by a fee (€150.00).

(Section 5, Planning & Development Act, pg 28)

Can photocopies of maps be given out to the public?

Photocopies of maps on planning applications registered before 11-Mar-2002 cannot be issued. Any photocopies of maps on files registered after 11-Mar-2002 must be individually date stamped and a declaration under Section 74 (4) of the Copyright and related Rights Act, 2000 must be signed by the purchaser of the maps and placed on the planning file.

Under the Planning regulations how long do the public have to lodge a submission/observation to additional information?

Use our Planning Deadline Calendar to calculate the last date for making an objection. 

In accordance with Article 35 of the Planning and Development Regulations, persons who made a submission or observation on a planning application will only be notified of the receipt of Additional Information or Clarification of Additional Information, where that AI or CAI is considered significant and requires new public notices.  Objectors have 2 weeks ( 5 weeks in case of applications accompanied by an EIS) from the date of receipt by the Planning Authority of the revised notices, to make further submissions/observations.  No further fee is required.  Other persons wishing to make a submission/observation will be required to pay the prescribed fee.

Please note that anyone other than the applicant can make an objection/observation on a planning application. 

 

I have planning permission, how is this affected?

Planning permission has no impact on the need for a Disability Access Certificate. If the works began on a building (other than dwellings houses) on or after January 1st 2010, then the Disability Access Certificate is required. 

What does a 'new or greater contravention' of the Building Regulations mean?

Material alterations or Extensions should not give rise to any ‘new or greater contravention’ in the existing building. That is, a material alteration or an extension (vertical or lateral) to an existing building should not make the existing building any worse in relation to Building Regulations.

The following examples are given by way of clarification:

The erection of an extension to an existing building whereby the extension is to be served for access and escape purposes by an existing staircase within the existing building:

•        If the existing staircase was adequate for the occupancy capacity of the existing building but inadequate for the extended building, this would constitute a ‘new contravention’ of Building Regulations.

•        If the existing staircase was inadequate for the existing building and rendered more inadequate due to the additional occupancy of the extended building, this would constitute a ‘greater contravention’ of Building Regulations.

Note, therefore, that Building Regulations as they apply to works in connection with existing buildings being materially altered or extended, require solely that the 'status quo' be maintained in the existing building. Where an existing building contravenes Building Regulations, the material alteration or extension of such a building does not carry with it the requirement to make good such contravention, but merely that the contravention is not worsened, i.e. that no new or greater contravention arises. Building Regulations do not apply retrospectively to existing buildings where such buildings are being extended except to the extent that any new or greater contravention is not permitted.

Where the design of a building or work on a building is changed (eg: unforeseen site conditions demand layout changes), what is expected?

A revised Disability Access Certificate is required where significant revision is made to the design or works or a material alteration to or a material change of use of a building in respect of which a Disability Access Certificate has been granted by a Building Control Authority. You may apply to the Building Control Authority for the revised certificate.

What options has the building owner where the application is refused or granted subject to conditions?

There is provision for an appeal to An Bord Pleanála in such cases. The appeal must be lodged within 1 month of the date of the decision on the application –see Part VI of the Building Control Regulations.

Note 2 requires a “certified” set of drawings. Who can ‘certify’ drawings?

It is expected that drawings will be certified by a person qualified to do so as a building professional- this would be expected to be the professional who completed the drawings.

Will the building owner or a person so authorised sign the statutory declaration in respect of works for which a Regularisation cert is sought?

This is a matter between the building owner and the builder/professional engaged by the building owner.

What height can I build my extension without permission?
  • The highest point to which the wall of an exempt extension can be built is eaves level.
  • If the proposed extension has a flat roof, it must not exceed the eves or parapet level
  • If the proposed extension has a pitched roof, it must not exceed the ridge of the existing pitched roof. 

 

If I wish to make a submission or observation on a Planning Application, when can I do so?

Use our Planning Deadline Calendar to calculate the last date for making an objection. 

Submissions/observations must be made within 5 weeks beginning on the date of receipt of the planning application. The five week period commences on the day that a planning application is received, such that the last day for receipt for an objection to an application received on Tuesday 1 November is Monday 5 December. If the last day of this five week period falls on a Saturday, Sunday or Public Holiday, submissions/observations can be accepted on the next working day.

Please note that anyone other than the applicant can make an objection/observation on a planning application. 

For more information on the objections process please visit our Planning Objections Page

How many vacant sites are registered with dlrcoco?

There are currently 12 sites registered as vacant with dlrcoco. Please see the the full list here.

What is a Protected Structure?

Protected Structures are buildings, features and structures within Dún Laoghaire-Rathdown that are protected because they meet one or more of the Categories of Special Interest set out in Section 51 (1) of the Planning & Development Act, 2000 and Section 2.5.4 of the Architectural Heritage Protection Guidelines. These categories are Architectural, Historical, Archaeological, Artistic, Cultural, Scientific, Technical and Social.

The list containing all the structures that are protected within Dun Laoghaire Rathdown is known as the Record of Protected Structures (RPS). Prior to an Act in 1999 these buildings or features were known as Listed Buildings, but this title no longer applies. The RPS is a dynamic record to which structures continue to be added and sometimes deleted.

Why are you adding a new structure to the RPS?

Section 54 of the Planning and Development Act, 2000 (as amended), states that a planning authority may add to or delete from its record of protected sturtures if it considers that an addition is necessary to protect a structure (or part of a structure) of special architectural, historical, archaeological, artistic, cultural, scientific, social or technical interest.

The Red Brick (former) Chapel is considered to be of:

  • Architectural Interest
  • Historical Interest, and
  • Artisitc Interest.
What are the fees at stage 1?

There are no fees at stage 1.

What are the fees at stage 2?

The fee at stage to is €1,500,, that would be submitted through the planning portal.

What are the fees at stage 1?

There are no fees at stage 1.

What are the fees at stage 2?

The fee at stage two is €1,500, that would be submitted through the planning portal.

What are the fees at stage 3?

The fees for stage 3 are as follows:
There is a charge of €130 per housing unit.
Other structures are charged at €7.20 per square metre to a max of €32,400

There is a retention charge of €390 per housing unit.
Other structures are have a retention charge of €15 per square metre to a max of €65,000

Submission of EIS at €10,000
Submission of NIS at €10,000

How can I find out further information about the mapping and submissions process?

If further information is required on the draft map process or on making a submission please check ‘Your Questions Answered’ which can be found here. If your query relates to a particular area of land or if the answer is not contained in the FAQ’s contact the Dun Laoghaire-Rathdown County Council Planning Department.

Further information on the process is also available in the ‘Residential Zoned Land Tax - Guidelines for Planning Authorities’. 

As outlined above, the RZLT process has two parts.  Local authorities are required to undertake the mapping which identifies the land which is subject to the tax, including an annual update of the final map which will be published on 1 December 2023. Thereafter, the administration of the tax will be undertaken by the Revenue Commissioners.

As Dun Laoghaire Rathdown County Council do not administer the tax we are unable to answer any queries regarding the administration of the tax. All queries regarding the administration of the tax should be directed to the Revenue Commissioners

Having regard to the respective roles of local authorities and the Revenue Commissioners in the RZLT process, queries on the mapping should be made to Dún Laoghaire-Rathdown. This includes queries on;

• Criteria for inclusion on Draft map
• Submissions on Draft Map
• Determinations on Draft Map
• Supplemental map
• Submissions on supplemental map
• Determinations on Supplemental map
• Zoning submissions
• Appeals (which must be submitted to An Bord Pleanála)
• Final map
• Annual revised Final map

Queries on administration of the tax should be made to the Revenue Commissioners website –This includes queries on;

• What constitutes a relevant site for the purpose of RZLT
• Liable persons
• Amount of residential zoned land tax
• Obligation to register
• Obligation on liable person to prepare and deliver return
• Abatements
• Deferral of residential zoned land tax

What do I do if I am a Homeowner?

My house and garden is contained on the map. What is the consequence?
Your house and garden is identified on the map because it meets the criteria for the tax, which is based on residential led zonings and servicing by infrastructure suitable for provision of housing.  The house and garden are not liable for the tax, as long as the house is subject to Local Property Tax (LPT).

Do I need to make a submission?
While anyone may make a submission, it may not be necessary, as a home owner, to make a submission.  Even if your house is identified on the maps, residences shall not be chargeable to the Residential Zoned Land Tax.

What if my garden is greater than 0.4047ha (1 acre)?
If your garden is greater than this size, then you need to register for the RZLT with the Revenue Commissioners, however your house and garden will not be liable for the tax. You will be able to register for RZLT from late 2023 onwards. No action needs to be taken to register at this time.  Please see revenue.ie for details closer to the time.

What is a Local Area Plan?

A Local Area Plan (LAP) is a statutory document prepared by the Local Authority in accordance with the requirements of the Planning and Development Act 2000 (as amended). A LAP consists of a suite of policies and objectives to guide the development of an area for a period of 6 years.

A LAP sets out a land use strategy for the proper planning and sustainable development an area and consists of a written statement and maps indicating:

  • objectives for the zoning of land for the use solely or primarily of particular areas for particular purposes, or
  • other objectives in such detail as may be determined by the Planning Authority for the proper planning and sustainable development of the area to which it applies, including the objective of development of land on a phased basis and, detail on community facilities and amenities and on standards for the design of developments and structures.
How do I make a submission?

Submissions / observations on the Pre-Draft Consultation can be made in one of the following ways:

  • In writing to - Senior Executive Officer, Planning and Economic Development Department, Dún Laoghaire Rathdown County Council, County Hall, Marine Road, Dún Laoghaire, Co. Dublin, A96 K6C, or,
  • Online through our Consultation Hub
Will there be information sessions?

Yes, there will be two public information sessions in St. Gerard's School, Thornhill Road on:

  • Thursday 18th May from 4pm-8pm, and,
  • Monday 29th May from 4pm-8pm.

Building Control

What is a Disability Access Certificate?

A Disability Access Certificate is a certificate granted by a Building Control Authority which certifies compliance of the design of certain works (e.g. new buildings (except dwelling houses), some extensions to, and some material alterations to buildings (except dwelling houses) with the requirements of Part M of the Building Regulations. 

When is a Disability Access Certificate required?

A  Disability Access Certificate is required in respect of the following works to buildings other than dwellings (but including apartment buildings), in so far as the Requirements of Part M apply and which commence or take place on or after 1 January 2010;

(a) works in connection with the design and construction of a new building,

(b) works in connection with the material alteration of—

(i) a day centre,

(ii) a building containing a flat,

(iii) a hotel, hostel or guest building, or

(iv) an institutional building, or

(v) a place of assembly, or

(vi) a shopping centre,

but excluding works to such buildings, consisting solely of minor works,

(c) works in connection with the material alteration of a shop, office or industrial building where —

(i) additional floor area is being provided within the existing building, or

(ii) the building is being subdivided into a number of units for separate occupancy,

(d) works in connection with the extension of a building by more than 25 square metres,

(e) a building as regards which a material change of use takes place, (see note below)

It should be noted in this context, that the Requirements of Part M 2000

• apply to all works in connection with a material alteration or an extension, without requiring any further work to the existing building1,2.

• do not apply to a material change of use, except where a material alteration or extension is associated with the material change of use, in which case refer to the previous point3.

1 Article 11 of the Building Regulations 1997-2008 also stipulates the Regulations apply to every part of a buildings affected by the material alteration or extension but only to the extent of prohibiting any works which would cause a new or greater contravention, in such building.

2 Part M does not apply to works in connection with extensions to and the material alterations of existing dwellings, provided that such works do not create a new dwelling.

3 The Requirements of Part M 2010 due to commence on 1 January 2012 amended Article 13 to include the application of Part M to certain material changes of use. It also amended Article 11 of the Building Regulations to extend the definition of a Material Alteration to include Part M. 

Are there transitional arrangements for the introduction of the Disability Access Certificate?

The requirement for a Disability Access Certificate came into effect on 1st January 2010 for new buildings (other than dwellings houses) which commence on or after that date. 

Is a Disability Access Certificate required prior to submitting a commencement notice?

A person shall not carry out works in contravention of Part M of the Second Schedule to the Building Regulations 2000 or any conditions subject to which a Disability Access Certificate is granted (where a Disability Access Certificate is required). 

To avoid potentially expensive remedial work,  it would be considered good practice to apply for a DAC at the same time as a Fire Safety Certificate ((FSC) prior to submitting a commencement notice), therefore ensuring that the DAC and any conditions pertaining to it are set out prior to commencement of works.  

However, a DAC may be applied for after commencement notice, but in no case shall a building be opened, operated or occupied or permitted to do so unless a DAC has been granted or pending determination of an appeals process.

A commencement notice must be submitted between 14-28 days in advance of work commencing.

Can works commence on a relevant development prior to the granting of a Disability Access Certificate?

Technically, a Disability Access Certificate is not required in advance of commencement of work. However, a person shall not carry out works in contravention of Part M of the Second Schedule to the Building Regulations 2000 or any conditions subject to which a Disability Access Certificate is granted (where a Disability Access Certificate is required). 

To avoid potentially expensive remedial work,  it would be considered good practice to apply for a Disability Access Certificate at the same time as a Fire Safety Certificate, therefore ensuring that the Disability Access Certificate and any conditions pertaining to it are set out prior to commencement of works.  

How long will a Disability Access Certificate take to process?

The timescale is up to 8 weeks under Section 6(5) of the Building Control Act, 1990, or longer if agreed between the applicant and the Building Control Authority.

When should I apply for the Disability Access Certificate?

You should apply at the same time as applying for a Fire Safety Certificagte. The time scale for assessment of both applications is the same. This ensures you have all relevant information prior to construction

What If I have my Fire Safety Certificate already but no Disability Access Certificate?

Apply for the Disability Access Certificate immediately/ as soon as possible. Paragraph 2(b) of Departmental Circular BC11/2009 lists what should be provided with the application. Further material may be requested by the Building Control Authority.

If a proposed development has already been granted planning permission and a FSC prior to 01/01/10, but works have not commenced prior to that date, is a Disability Access Certificate required?

Yes. 

Is a Disability Access Certificate required for a material change of use of a building ?.

A Disability Access Certificate is required for certain works to which the Requirements of Part M apply. Refer to Article 20 D (1) of S.I. 351)  Part M will apply to a material change of use of a building only when it includes a material alteration - in such cases Part M will apply to all works in connection with the material alteration and a Disability Access Certificate should be applied for.

Does an application for a Disability Access Certificate have to show compliance with the proposal for a revised Part M, which was the subject of a public consultation process in 2009?

No. The Disability Access Certificate will certify compliance with the requirements of the current Part – Part M 2000. Draft Part M 2009 proposals have not yet been finalised. However, additional information may be required for Disability Access Certificate applications when future revisions of part M become operative.

Which of these scenarios require a Disability Access Certificate?

Yes:  New buildings, including apartment blocks

No:  Dwelling houses

Yes:  Material alteration to a day care centre, apartment block, hotel, hostel, guest building, institutional building, place of assembly, shopping centre

Yes:  Material alteration to a shop, office or industrial building where additional floor area is provided within existing building or building is being subdivided into a number of units for separate occupancy.

Yes:  Extension to an existing building other than a dwelling house of greater that 25m2

No:  Existing building was damaged/burnt and is being repaired.

No:   A material change of use, by itself -  see above

Yes:  A material change of use involving a material alteration associated with the change of use.

Will there be a 7 day Notice or a Regularisation Certificate in respect of the Disability Access Certificate?

There is no need for a 7 day notice in respect of a Disability Access Certifiate, as a Disability Access Certificate is not required prior to commencement - see above.

There is no need for a regularisation certificate as Disability Access Certificate only applies to works commencing from Jan 1 2010 and not retrospectively. A Disability Access Certificate must be acquired prior to opening, operating or occupying a building to which works required a Disability Access Certificate. A Disability Access Certificate can be applied for this purpose. 

What is the fee for a Disability Access Certificate?

The fee is €800 per building.

Why are schools, bar the smallest, not exempt from Disability Access Certificate fees?

The Regulations provide for an exemption from fees for primary schools only with 4 mainstream teachers or less, as requested by the Department of Education and Science.

Is there a sq.m application fee for a Disability Access Certificate?

There is no sq.m application fee for a Disability Access Certificate.

Can agents sign the Disability Access Certificate application form on behalf of the applicant?

Yes, if they are authorised to do so by the building owner.

The form for a revised Disability Access Certificate requires working drawings. Working drawings are only progressed where work has commenced.

The need for a revised Disability Access Certificate is not limited to works which have not commenced. It applies where significant revision is made to the design of the building or  works already commenced.  

If a Disability Access Certificate has not been sought for a building where it is required or where an appeal has been lodged with An Bord Pleanála in respect of a decision on a Disability Access Certificate application, what is the position?

A building cannot be opened, operated or occupied or permitted to be opened, operated or occupied  without the necessary Disability Access Certificate  or where an appeal has been lodged, pending the determination of the appeal. 

 

What is a Regularisation Certificate?

A certificate granted by a building control authority in respect of works on non-domestic buildings and apartments blocks which were commenced or completed  without  the necessary Fire Safety Certificate (FSC). The certificate may be granted with or without conditions or refused. 

Is there a fee for a Regularisation Certificate?

The fee is €500 which is four times the fee for a Fire Safety Certificate or €11.60 per square metre of floor area, whichever is greater. This may vary depending on the works - please see the Fifth Schedule of the Building Control Regulations.

A period of 4 months is set down to comply with conditions which may be inserted by the Building Control Authority in a Regularisation cert. This is not sufficient time and is there a mechanism to extend it?

There is no mechanism to extend. It is an offence to commence work on a building without a Fire Safety Certificate (where required) and the Regularisation Cert is a chance to be in compliance  with the fire safety certification regime. If the works are not carried out within the 4- month period, the certificate will not have effect.

Can a solicitor sign a statutory declaration as a Commissioner of Oaths?

Yes, when s/he is also a Commissioner of Oaths. However, a solicitor shall not exercise these powers in any proceedings in which he is solicitor to any of the parties or in which he has an interest.

Do I require a Final Grant of Planning Permission before I submit my Commencement Notice?

Yes. Final Grant is required before a commencement notice can be submitted. 

How many days prior to starting the development am I required to submit a Commencement Notice?

You must submit a Commencement notice between 14 - 28 days before starting works, informing the Building Authority of your intended start date. If this is not completed youa re in breach of your Planning Conditions. 

Can I still submit a paper copy of a Commencement Notice?

No. Paper copies are no longer accepted. All forms must now be submitted electronically via the Building Control Management System (BCMS) website. 

What is the Fee for a Commencement Notice?

The fee is €30 per unit

If my development is Apartments/Commercial do I require a Fire Safety Certificate?

Yes. When submitting a commencement notice for a Commerical Development or Apartments a Fire Safety Certificate must also be submitted. 

If I am building several apartments in a one block.What is the fee?

The fee is €30 per block of apartments. You do not require a separate commencement notice for each apartment.
e.g 100 apts in one block = €30

What is a 7 day notice?

It is a fast track notification of commencement of work prior to the granting of a Fire Safety Certificate.

What is the fee for a 7 day notice?

The standard fee is €250 or €5.80 per square metre of floor, whichever is the greater. This is double the amount for a standard Fire Safety Certificate application. 

The fee may vary depending on the work proposed and the fees are listed in the Fifth Schedule of the Building Control Regulations
Do I need to apply for a Fire Safety Certificate as well and do I have to pay a fee for both?

Yes, the 7 Day notice must be accompanied by a valid Fire Safety Certificate application and a statutory declaration form in respect of the work proposed, but only the fee for the 7 day notice applies. 

You do not have to submit separate fees for both the 7 Day Notice and the Fire Safety Certificate.
Can you apply for a 7 day notice if you have already applied for a Fire Safety Certificate?

Yes, if you have made a valid application for a Fire Safety Certificate you may submit a 7 day notice provided you submit the reference number of the original application, the revised fee and all the required documentation as listed in Article 20A of the Regulations. You should liaise with your local Building Control Authority.

Planning Applications - Online Search

Can I lodge a submission on an SHD application?

Submissions/observations for Strategic Housing Development SHD applications must be sent to An Bord Pleanála only.  Any submissions on SHD applications which are sent to this County Council will be returned to the sender.

County Development Plan

What is a Development Plan?

In simple terms, a Development Plan is a spatial plan that guides the future development of a County for a six-year period through a suite of policy objectives, land use zoning objectives and development management guidance.

A Development Plan must ensure that there is enough land zoned in the County to meet our housing requirements which are set at a regional level. Chapter 1 of the Plan sets out more detail in relation to the legislative context and structure of the Development Plan.

A short video was prepared at the Draft Plan stage which provides an overview of what a Development Plan is and the vision for the County for the period 2022-2028 (note: the Draft Plan consultation ended in April 2021 - submissions can no longer be accepted). 

Section 10 of the Planning and Development Act, 2000 (as amended) sets out the statutory content of a Development Plan – these requirements are summarised in Appendix A of the pre-draft ‘Have Your Say’ document.

Can I still view the Draft Plan, Amendments to the Draft Plan and Chief Executive's Reports?

All plan documents and Chief Executive's Reports associared with each stage involved in the preparation of the County Development Plan 2022-2028 is set out above.

The Draft Plan can also still be viewed within the virtual room that was prepared for its consulation phase.

 

Can I download documents?

Yes – all Development Plan documents are provided on our webpage as downloadable PDFs.

Each Volume of the Chief Executive’s Report is provided on our webpage as a downloadable PDF.

Note: The Ministerial Direction effects certain parts of the adopted Plan that is currently available to download. The Planning Authority are updating all relevant sections which will be available to download in due course. 

Will the Development Plan tell me what is happening in my area?

A Development Plan sets out the land use zoning objectives for an area.

The land use zoning objectives for the County are set out over a series of 14 maps and an interactive webmap.

Certain uses which may be permitted in principle or open for consideration within each land use zone is set out Chapter 13 of the Development Plan.

Proposed development within an area occurs when a developer (public or private), or an individual, proposes and obtains the relevant planning permission. This ‘development management’ process is separate to the Development Plan making process. Proposed development is required to accord with the provisions of a Development Plan.

I’m not sure which map is relevant to my area, is there another way to find out what land use objectives are relevant to me?

Yes – our interactive map has an address search function.  To zoom into your desired location, simply enter your address or Eircode, in the ‘find’ bar located at top left of the map.

If you want to download the map relevant to your area, the easiest way to find the correct map is to visit the map area in our virtual room where a map index shows all map numbers and the areas they cover.

Why have I received a letter / more than one letter?

All owners and occupiers of properties or structures added to or deleted from the Record of Protected Structures (RPS) in the adopted Plan are legally required to be notified as per Section 12(13) of the Planning and Development Act (as amended).

The requirements of Section 12(13) of the Act may result in you receiving two letters if the owner is also occupier the structure added or deleted from the RPS.

The Record of Protected Structures is set out in Appendix 4 of the Development Plan and are shown in a dark yellow colour on land use zoning maps

Why was my property added to the Record of Protected Structures (RPS)?

Your property / structure was been recommended for inclusion onto the Record of Protected Structures “in order to protect a structure, or part of a structure, of special architectural, historical, archaeological, artistic, cultural, scientific, social or technical interest” (Section 54 of the Planning and Development Act, 2000, as amended).

A notice was issued to owners/occupiers of properties/structures recommended to be added to the RPS at Draft Plan stage. The notice issued states whether the recommendation was made by the Minister for Housing, Local Government and Heritage or by the Planning Authority.

Properties / structures recommended for addition by the Minister resulted from surveys carried out for part of the County. More specific details for a particular structure can be found in the surveys of the National Inventory of Architectural Heritage: here.

Properties / structures recommended for addition by the Planning Authority were as a result of either - submissions received at pre-draft stage (see pre-draft CE Report for details), Motions from Elected Members (see Special Meetings from December 15-18th 2020), the property / structure was brought to our attention during the preparation of the current County Development Plan 2016-2022 or when dealing with planning applications since the adoption of the current Plan.

Further details with regard to Protected Structures can be found here on the Conservation section of our website.

I have received a letter in error – who should I contact?

If you have received a letter in relation to the addition of property / structure to the Record of Protected Structures in error, please advise the Planning Department as soon as possible using the contact details at the top of the letter.

I don’t agree or I think an amendment is required, can I do anything about the addition of my property / structure to the RPS?

If you do not agree with the addition of your property / structure to the RPS or if you think an amendment is required to the name / address / description of the structure or the extent of the structure on the land use maps, please make a submission on the Draft Plan. Please ensure to clearly identify the structure in question in your submission.
All submissions / observations received in relation to properties / structures recommended by the Minister for Housing, Local Government and Heritage will be sent to the Minister for their consideration.
Details on how to make a submission to the Draft Plan can be viewed here.

Why was my property not added to the RPS previously?

The surveys carried out by the Minister for Housing, Local Government and Heritage for part of the County were not fully completed prior to the adoption of the current County Development Plan 2016-2022.

What is an Architectural Conservation Area (ACA) and where can I find more details on new ACA's?

An Architectural Conservation Area (ACA) is a place, area, group of structures or townscape that is of special architectural, historical, archaeological, technical, social, cultural, or scientific, interest, or that contributes to the appreciation of a Protected Structure. An ACA aims to identify and protect areas of special significance and promote an awareness of this significance.

All ACA's are listed in Appendix 4 of the Development Plan with links to each of their Character Appraisal documents.

Further details with regard to ACA’s in general can be found here on the Conservation section of our website.

 

Can changes be made to the boundary of a proposed ACA?

If you consider that further adjustment to the boundary of a proposed ACA is required, please make a submission on the Draft Plan.
Details on how to make a submission to the Draft Plan can be viewed here.

If my query isn’t listed here, who should I contact?

In the event that your query has not been covered here, please contact E: planning@dlrcoco.ie / T: 01 2054700.

DISCLAIMER

The list of FAQs do not purport to be a legal interpretation of the Planning and Development Act 2000, (as amedned) and are simply for information purposes.

Can I get a hard copy of the Plan?

The Dún Laoghaire Rathdown County Development Plan 2022-2028 is available to view above. Hardcopies are available to view at Planning Department, County Hall, Marine Road, Dún Laoghaire, Co. Dublin Mon-Fri (excluding Bank Holidays) between 10.00a.m. and 4.00p.m. and at the Council Offices, Dundrum Office Park Main Street, Dundrum, Dublin 14 Mon-Fri (excluding Bank Holidays) from 9.30a.m. to 12.30p.m. and 1.30p.m. to 4.30p.m.


Hardcopies of the Plan will not be available to purchase until after the process of updating plan documents and maps, to incorpoarte the requirements of the Ministerial Direction, is complete.

My property appears to be within a flood zone – why is this?

Flood Zone Maps are maps of areas predicted to be at risk of flooding in the 1.0% annual exceedance probability (AEP) event (1 in 100 year - Flood Zone A) and the 0.1% AEP event (1 in 1000 year - Flood Zone B).
The Flood Zone Maps were produced as an output of the Eastern Catchment Flood Risk Assessment & Management (ECFRAMs) project (2010 -2017) and were subject to statutory consultation and approval during that period.


For specific flood risk considerations of an area, please Appendix 15 Strategic Flood Risk Assessment of the Development Plan.

The interactive map isn’t working properly – what can I do?

The interactive map may not function properly for a number of reasons, often a simple refresh of the page will reload it without issue. Some other suggestions that may remedy your issue include:
• The interactive map works best and should be opened on one of the following web browsers: Chrome, Firefox, Safari or Edge.
• Please ensure that you have accepted the terms and conditions by ticking the box upon opening the map.
• Some layers will not load until you zoom into an area.
• The mapping service provider esri may be carrying out essential updates – this is usually a very limited time only and the map may load successfully again in 10-15 minutes time.

Land use mapping for the entire county is available to download as separate PDF documents from our webpage.
In the event that you continue to have difficulty accessing the interactive map, please contact us planning@dlrcoco.ie with details of the issue.

Why was the Draft Plan amended?

During the Special Development Plan Council meetings on 12th, 13th, 14th,18th 19th, 20th and 21st of October 2021, the Elected Members, by way of resolution, agreed to amend the Draft Development Plan.
The proposed amendments, or material alterations, resulted from:
• A recommendation in the Chief Executive’s Report on Draft Plan Consultation,
• A motion proposed by an Elected Member, and/or
• A combination of the above.

Will there be someone available to answer queries during the public consultation?

Members of the planning team will be available to answer queries at the following times / locations (subject to public health guidelines):

  • Tuesday 16th November, 10:00 am – 1:00 pm, County Hall, Dún Laoghaire.
  • Thursday 25th November, 2:00 pm – 4:00 pm, Dundrum Civic Offices.
  • Tuesday 30th November, 9:30 am – 12:30 pm, Dundrum Civic Office.
  • Wednesday 8th December, 2:00 pm – 4:00 pm, County Hall, Dún Laoghaire.
  • Thursday 16th December, 2:00 pm - 4:00 pm, County Hall, Dún Laoghaire.
  • Tuesday 11th January 2022, 9:30 am – 12:30 pm: Dundrum Civic Office.

For queries outside of these times, please contact E:  devplan@dlrcoco.ie / T: 01 2054700.

When did the new Development Plan come into force?

The County Development Plan 2022-2028 was made / adopted, with amendments, by the elected members during Special County Development Plan meetings on the 9th and 10th March 2022.

Section (12) (17) of the Planning and Development Act, 2000 (as amended), states:

"A development plan made under this section shall have effect 6 weeks from the day that it is made."

The new plan came into force on the 21st April 2022.

When will planning applications be assessed under the new Plan?

Proposed development (planning applications) will be assessed upon the provisions of the development plan in force at the time of making a decision in accordance with Section 34(2)(a) of the Planning and Development Act 2000 (as amended), which states:

“(2) (a) When making its decision in relation to an application under this section,
the planning authority shall be restricted to considering the proper planning
and sustainable development of the area, regard being had to—
(i)   the provisions of the development plan, …”

The Plan came into force on 21st April 2022 therefore all decisions are now being assessed having regard to the policy objectives of the new plan.

When and where can I view the adopted Plan?

The Dún Laoghaire Rathdown County Development Plan 2022-2028 is available to view above. Hardcopies are available to view at Planning Department, County Hall, Marine Road, Dún Laoghaire, Co. Dublin Mon-Fri (excluding Bank Holidays) between 10.00a.m. and 4.00p.m. and at the Council Offices, Dundrum Office Park Main Street, Dundrum, Dublin 14 Mon-Fri (excluding Bank Holidays) from 9.30a.m. to 12.30p.m. and 1.30p.m. to 4.30p.m.

Hardcopies of the Plan will not be available to purchase until the process relating to the Draft Ministerial Direction is complete.

 

What is a Ministerial Direction?

As set out in Section 31 of the Planning and Development Act, 2000 (as amended), a Minister for Local Government and Planning may issue a ‘direction’ to amend a plan where they are of the opinion that a County Development Plan:

  • Has failed to implement the recommendations of, or take account of a submission made by, the Minister or the Office of the Planning Regulator;
  • Has failed to set out an overall strategy for the proper planning and sustainable development of the area;
  • Is not consistent with – the National Planning Framework, the Regional Spatial and Economic Strategy or a specific planning policy requirement specified set out in the Section 28 Guidelines;
  • Is not in compliance with the requirements of the Act;
  • Is not consistent with the transport strategy of the National Transport Authority (within the Greater Dublin Area).
Why has the Minister issued a Direction?

As per Section 31AM(6) of the Planning and Development Act, 2000 (as amended), the Planning Authority notified the Office of the Planning Regulator (OPR) of the making of the Plan within 5 working days of its adoption.

The OPR was of the opinion that the development plan was not made in a manner consistent with the recommendations of the office and failed to set out an overall strategy for the proper planning and sustainable development of the area concerned. The OPR therefore issued a notice with recommendations to the Minister for Local Government and Planning.

The Minister exercised his function to rectify the matter by issuing a Draft Direction in accordance with Section 31(7) of the Planning and Development Act, 2000 (as amended), to the Planning Authority with regard the making of the Dún Laoghaire-Rathdown County Development Plan 2022-2028.

In accordance with Section 31 of the Planning and Development Act, 2000 (as amended), the Minister issued the Planning and Development (Dún LaoghaireRathdown County Development Plan 2022-2028) Direction 2022 to the Planning Authority on 28th September 2022. 

What impact does the Ministerial Direction have on the Development Plan?

In accordance with the Planning and Development (Dún LaoghaireRathdown County Development Plan 2022-2028) Direction 2022, the following sections of the County Development Plan 2022-2028 did not come into force on 21st April 2022 and will be deleted from the Adopted Plan:

  • The 0/0 objective including the symbol, boundary of objective area* as set out on Land Use Zoning Maps 3, 4, 7 and 10.

  • The text “No increase in the number of buildings permissible” in the legend of Land Use Zoning Maps 1-14.

  • The policy section on ‘Notable Character Area Exclusions’ under section 4.3.1.1 of Chapter 4 (pg. 84) of the Written Statement.
    Section 12.3.7.8 ‘0/0 Zone’ of Chapter 12 (pg. 246-248) of the Written Statement.

  • The second paragraph of Section 12.3.3 ‘Quantitative Standards for All Residential Development’ of Chapter 12 (pg. 236) of the Written Statement, which states: “That the requirement for certain percentages of 3-bed units in apartments shall apply to Build To Rent developments to accord with mix on page 237.”

*An objective area boundary will be retained on Land Use Zoning Maps 3, 4, 7 and 10 for Specific Local Objective (SLO)130.

Only those sections listed above are affected by the Direction, the remainder of the County Development Plan 2022-2028 came into force on 21st April 2022.

The Planning Auhtority are now making the necessary changes to the Adopted Plan documents and maps which will be published online and made available to view and/or purchase thereafter.

Planning Legislation, Regulation & Guidelines

Back